Case Study: Upgrading an old Makeup Air Unit to a Heat Pump

June 11, 2024

Transforming Fresh Air Delivery with Modern Heat Pump Technology

Project Overview: A 20-story residential high-rise in Atlanta underwent an ASHRAE Level II Energy and Water Assessment conducted by Verdius Energy. As part of the assessment, the existing makeup air unit was identified for replacement with a more efficient heat pump system. This measure was highlighted due to its significant potential for energy savings and operational efficiency improvements.


Existing System:

  • Make: Aaon
  • Model: RM-025-8-0
  • Year Installed: 2005
  • Cooling capacity: 25 Tons
  • Efficiency: 14.2 SEER
  • Heating capacity: 75 kW
  • COP: 1
  • Supply fan: 3 HP
  • Outside airflow: 4,500 CFM


Identified Issues:

  • Although the existing unit provided necessary ventilation, it is energy-intensive due to its reliance on electric resistance heating.
  • Over time, the unit's components, despite replacements and maintenance, have aged and operate less efficiently compared to modern HVAC technology.


Considerations:

  • The building exhaust is local and distributed throughout the building, so a heat recovery system using an enthalpy wheel could not be used.
  • The location of the unit on the roof meant it could only be replaced via airlift. Since the unit would need replacement anyway, the marginal cost of installing a heat pump was considered, instead of the fully burdened cost.


Proposed Solution:

  • Replacement with a modulating heat pump makeup air unit of similar size and capacity.
  • Increased cooling efficiency, from 14.2 SEER to 22.5 SEER, a 50% increase.
  • Increased heating efficiency, from 3.1 HSPF to 10.1 HSPF, a 3X increase due to the use of heat pump technology.
  • Benefits:
  • Energy Efficiency: Heat pump technology offers higher efficiency by transferring heat from outside, instead of generating it through electric resistance.
  • Operational Savings: Reduced electrical consumption for heating and cooling, leading to lower utility bills.
  • Environmental Impact: Proper disposal of ozone-depleting R-22 refrigerant and decreased greenhouse gas emissions due to improved efficiency.


Savings and Performance Metrics:

  • Electricity savings: 105,000 kWh/year
  • Annual cost savings: $9,800
  • Project cost: $15,600 (marginal cost of heat pump over baseline)
  • Simple payback period (SPP): 1.6 years


Incentives and Rebates:

Pending rebate through Georgia Power Custom Projects and Building Tune-Up programs, estimated at $5,000, reducing the net project cost to $4,800.


Additionally, the project qualified for a $20,000 Section 179D deduction.


Implementation Plan:

  • Solicitation: Prepared a design-build RFP and engaged qualified HVAC contractors with experience in high-rises and airlifts.
  • Timeline: To minimize disruption, the replacement was scheduled during the shoulder season.
  • Verification: Post-installation commissioning and measurement & verification (M&V) to ensure the unit operates as expected and achieves the projected savings.


Conclusion: Upgrading the makeup air unit to a heat pump instead of a code-minimum replacement represents a strategic investment in energy efficiency. The significant cost savings, combined with a short payback period and environmental benefits, made this measure a high-priority recommendation from the energy assessment. This project not only aligns with the property's sustainability goals but also enhances the building's operational performance and residents' comfort.


September 13, 2026
If you own or manage a building in Atlanta, you may already know you're subject to the city's energy efficiency requirements. The process of actually getting compliant can feel like a lot to untangle. This guide walks through what's required, how the process actually works, and what to expect along the way.
September 13, 2026
Hiring an energy efficiency consultant is different from hiring a one-time auditor — a consulting partner is someone you'll likely work with repeatedly, whether that's annual benchmarking, a one-time compliance audit, or a longer-term efficiency roadmap. Here are the questions worth asking before you commit to one.
July 8, 2026
If your building is subject to the City of Atlanta's Commercial Buildings Energy Efficiency Ordinance (CBEEO) — or you're planning ahead for when it will be — you'll need to hire a qualified energy auditor to complete your assessment. But "energy auditor" isn't a protected title, and the quality, cost, and compliance-readiness of the work varies a lot between firms. Here's what actually matters when you're vetting one.
Energy Auditor
April 29, 2025
If you’re looking into an energy audit for your building, one of the first questions you’ll ask is: How much does it cost? The answer varies depending on factors like the building type, size, and complexity of its systems. Most firms in the industry charge a fixed price per square foot , but at Verdius Energy, we take a different approach—one that aligns cost with value rather than an arbitrary formula.
Cooling Tower
March 14, 2025
Commercial HVAC systems are a major investment, and building owners often face a critical decision: repair the existing system or invest in a full replacement? While repairs can extend the life of your equipment, there comes a point where replacing the unit is the smarter financial and operational choice. In this post, we’ll break down key factors that determine when to repair and when to replace your HVAC system.
Heat recovery air handler graphic in a BAS system
February 3, 2025
🚀 Orlando property owners, it’s time to take action.
Woman Handling Paperwork
January 9, 2025
There are several ways Atlanta buildings may be exempt from the energy audit mandate. In certain cases, eligible buildings may have their deadlines extended or deferred.
Atlanta Skyline
September 5, 2024
These standards are a growing challenge for many organizations
Energy Audits in Atlanta
January 16, 2024
A Guide for Savvy Property Managers & Owners
Show More