Atlanta Botanical Garden

From audit to action

Verdius conducted an energy audit for the Atlanta Botanical Garden and then stayed on to help put the recommendations into practice, from high-efficiency equipment upgrades to an ongoing mechanical systems project.

20-story residential high-rise, Atlanta

Upgrading a makeup air unit to a heat pump

An ASHRAE Level II energy and water audit identified a 2005 electric-resistance makeup air unit for replacement with a modulating heat pump unit, priced at the marginal cost over a like-for-like replacement.

  • 105,000 kWhannual electricity savings
  • $9,800annual cost savings
  • 1.6 yearssimple payback
Read the case study →